◆ClearingPost

Regulatory text · SWIFT · Authoritative (T1)

CBPR+ Roadmap Beyond November 2025

Current version June 2026 · Effective Nov 15, 2026 (deferred per a later ClearingPost record) · entry recorded 5 Jun 2026

ClearingPost's CBPR+ roadmap document record keeps a 15 Nov 2026 date, while its latest recorded summary says the payments changes, including the structured address requirement, are deferred.

Open the current version at the publisher ↗

Systems it applies to

This document record is not bound to a ClearingPost payment system (schemes: sepa-sct, sepa-inst).

Also bound in ClearingPost's record, relationship not recorded: T2 / TARGET, TIPS, CHAPS, Fedwire. The document record does not show the T2 / TARGET operator as its publisher and does not name T2 / TARGET, so its dates are not shown as T2 / TARGET dates.

Publisher: SWIFT →

Upcoming effective dates

  • no revised date · previously 15 Nov 2026
    SWIFT · Authoritative (T1) · recorded 5 Jun 2026source ↗

Versions ClearingPost holds (2)

  1. June 2026effective effective date not recordedcurrent

    What changed: Updated CBPR+ roadmap (June 2026 edition) listing November 2026 (SR 2026) milestones: MT101 discontinued, non-compliant formats NAKd, only structured/hybrid postal addresses accepted; November 2027 legacy E&I formats discontinued, full Case Management mandatory; November 2028 MT 940/950/942 and MT 104/190/191 discontinued. On 27 August 2026 Swift applied a controlled extension of Standards Release 2026 that defers all payments changes, including the structured address requirement; Swift will provide an update on structured-address timing by December 2026 at the latest, and non-payments SR 2026 changes go live in Q1 2027.

    This version at the publisher ↗
  2. March 2026effective 15 Nov 2026 (deferred per a later ClearingPost record)

    What changed: SWIFT CBPR+ roadmap covering November 2026 Standards Release milestones: mandatory structured or hybrid addresses (unstructured prohibited), MT101 discontinuation replaced by CBPR+ pain.001 v9. Payment cancellation Stop and Recall Process (SRP) mandate postponed from November 2026 to November 2027. November 2026 milestones for addresses, MT101 end, structured addresses, and E&I MX receipt remain unchanged.

    This version at the publisher ↗